New Aixtron Reactor Installation

Project Scope

GHC were engaged by CMB Engineering as M&E and  Principal Designer for the construction of an ISO Grade 6 & 7 Clean Room to accommodate IQE’s new Aixtron Reactor at their St Mellons facility.

Works included:

  • Strip and removal of existing facility
  • Construction of new clean rooms
  • HVAC Systems
  • Chilled Water Systems
  • Process Cooling Water System ( Al Free )
  • Mains Water System
  • DI Water System
  • RO Water System
  • Process Gases including H2, SiH4 , N2 , N2+H2,
  • Building Management System
  • Drainage Systems
  • Oxygen Depletion Monitoring
  • Hydrogen / Hydride Monitoring
  • Gas Monitoring
  • Fire Suppression Systems
  • Inspection , Test , Commissioning and Validation
  • Small Power Installation
  • Lighting Systems
  • Fire Alarm
  • Access and Security
  • Structured Cabling

Project Value – circa. £1.1M