New Aixtron Reactor Installation
Project Scope
GHC were engaged by CMB Engineering as M&E and Principal Designer for the construction of an ISO Grade 6 & 7 Clean Room to accommodate IQE’s new Aixtron Reactor at their St Mellons facility.
Works included:
- Strip and removal of existing facility
- Construction of new clean rooms
- HVAC Systems
- Chilled Water Systems
- Process Cooling Water System ( Al Free )
- Mains Water System
- DI Water System
- RO Water System
- Process Gases including H2, SiH4 , N2 , N2+H2,
- Building Management System
- Drainage Systems
- Oxygen Depletion Monitoring
- Hydrogen / Hydride Monitoring
- Gas Monitoring
- Fire Suppression Systems
- Inspection , Test , Commissioning and Validation
- Small Power Installation
- Lighting Systems
- Fire Alarm
- Access and Security
- Structured Cabling
Project Value – circa. £1.1M