Severnside Energy Project

Project Scope

GHC were engaged carry out a full design appraisal and installation quality control at the new Energy from Waste Facility at Severnside in Bristol

The services  scope included :

  • Heating system generated from waste steam
  • Absorption chilled water system
  • Air Conditioning Systems
  • Smoke Ventilation Systems
  • Specialist Ventilation Systems
  • Building Management Systems
  • Fire Suppression Systems
  • Lighting and Controls Systems
  • Fire and Security
  • Essential and Non Essential Power Systems
  • Specialist Process Gases
  • Access Control
  • Sprinkler Systems
  • Testing ,Commissioning and Validation

Value : circa £8.0M

Address

Energy Recovery Centre
Severn Beach,
Bristol
BS10 7SD